Active Projects by Interstates
I-20
I-20/I-520 Interchange Project (Richmond)
This project is designed to replace the existing interchange configuration, increase capacity and reduce noise pollution in this area
Fairburn Road at I-20 (Douglas)
Approximately 1 mile of roadway reconstruction, intersection Improvements and construction of a new bridge over I-20 at Fairburn Road.
I-75/85 Downtown Connector
14th Street Bridge Reconstruction Project (Fulton)
The Georgia Department of Transportation has begun a Reconstruction Project of the 14th Street Bridge. This project is scheduled to be completed on May 31, 2010.
I-75
Interstate 75 Reconstruction in South Georgia (Crisp/Dooly)
The latest information on the Reconstruction project on Interstate 75 from SR 133 (Exit Number 18) in Valdosta to the Crisp-Dooly County Line.
I-85
I-85 High Occupancy Toll (HOT) Lanes (DeKalb/Gwinnett)
The proposed project includes the conversion of approximately 16 miles of High Occupancy Vehicle (HOV) lanes to High Occupancy (HOT) lanes on the I-85 corridor from just south of I-285 in DeKalb County to Old Peachtree Road in Gwinnett County.
I-85/West Point Interchange Project (Troup)
This proposed project will identify and construct the interchange improvements needed to provide the necessary I-85 access for site-generated traffic from the Kia Motors plant in West Point, Georgia.
I-85 Reconstruction/Widening Projects (Meriwether/Coweta/Fulton)
An overview of reconstruction and widening projects along I-85 in Meriwether, Coweta and Fulton counties.