Home About GDOT Employment Contact Us
1.1 Foreword 1.2 Preface 1.3 The Consultant as an Extension of GDOT Staff1.4 Responsibility Chart Revised 12/1/011.5 Draft Consultant Performance Evaluation Form
2.1 Introduction Revised 11/19/012.2 Guidelines for Project Notifications within DOT Revised 11/19/012.3 Guidelines for Work on Private PropertyRevised 11/2/01 2.3.1 Sample Right-of-Entry Letter 2.3.2 Sample Project Access Letter - Consultant 2.4 Erosion Control and Site Restoration Revised 11/19/012.5 Limitations of Liability - GDOT Consultants Revised 11/15/012.6 Unsuitable Materials - Investigations Revised 11/15/012.7 Sample Retention, Storage, and Handling Revised 11/12/04
2.3.2 Sample Project Access Letter - Consultant
3.1 Introduction 3.1.1 BFI Reconnaissance Form Revised 4/6/04 3.2 Typical Software for BFI's Revised 11/16/013.3 BFI- Drilling, Sampling and Special Notes Revised 11/5/01 3.3.1 BFI Blank Report Template Revised 02/27/093.3.2 Sample BFI Report - Coastal Plain Region3.3.3 Sample BFI Report - Piedmont or Valley and Ridge Region 3.4 Supplemental BFI Information 3.4.1 General Guidelines for Foundation Types within Georgia Revised 2/24/063.4.2 Guidelines for Selecting Pile Minimum Tip Elevations Revised 12/993.4.3 Sample Boring Layout with Cross-Section3.4.4 Sample Boring Log3.4.5 Bridge Foundation Types3.4.6 Pile Bent3.4.7 Concrete Bent with Pile Footing3.4.8 Concrete Bent with Pedestal Footing3.4.9 Concrete Bent with Spread Footing3.4.10 Tower Pile Bent 3.5 BFI Checklist Revised 2/27/063.6 Guidelines for Scope & Cost Estimate Workbooks Revised 11/15/01 3.6.1 Personnel Job Descriptions3.6.2 BFI & Other Structures Cost Proposal Worksheets
3.1.1 BFI Reconnaissance Form Revised 4/6/04
3.3.1 BFI Blank Report Template Revised 02/27/093.3.2 Sample BFI Report - Coastal Plain Region3.3.3 Sample BFI Report - Piedmont or Valley and Ridge Region
3.4.1 General Guidelines for Foundation Types within Georgia Revised 2/24/063.4.2 Guidelines for Selecting Pile Minimum Tip Elevations Revised 12/993.4.3 Sample Boring Layout with Cross-Section3.4.4 Sample Boring Log3.4.5 Bridge Foundation Types3.4.6 Pile Bent3.4.7 Concrete Bent with Pile Footing3.4.8 Concrete Bent with Pedestal Footing3.4.9 Concrete Bent with Spread Footing3.4.10 Tower Pile Bent
3.6.1 Personnel Job Descriptions3.6.2 BFI & Other Structures Cost Proposal Worksheets
4.1 Introduction Revised 12/12/014.2 Soil Survey Reconnaissance Form Revised 4/15/044.3 Soil Surveys - Drilling, Sampling, and Special Notes Revised 2/17/064.4 Soil Survey Summary Reports 4.4.1 Blank Soil Survey Report Template Revised 12/18/094.4.2 Sample Soil Survey Report - Coastal Plain Region4.4.3 Sample Soil Survey Report - Piedmont Valley or Valley and Ridge Region4.4.4 County map-soils memo4.4.5 County Map4.4.6 Guidelines for Subgrade Treatment Revised 2/28/064.5 Supplemental Soil Survey Information 4.5.1 Physiographic Regions in Georgia4.5.2 Erosion Index Revised 4/11/974.5.3 Historical pH and Resistivity Values4.5.4 Sample Roadway Profile4.5.5 Soil Classifications4.5.6 Soil Classes4.5.7 Counties with Acid-Producing Rock4.5.8 Sample Field Book Entries4.5.9 Erosion Index Chart4.5.10 Sample Laboratory Testing Report4.5.11 Sample Detail for Rock Cut4.5.12 Sample Removal Detail4.5.13 Correlation Chart for Estimating Soil Support Value(s)4.5.14 Regional Factors for Use in Flexible Pavement Design4.5.15 K Values4.5.16 Map of Acceptable Soil Cement Use Revised 2/12/044.5.17 Sample Rock Embankment Slope Detail4.5.18 Sample Soil Reinforcement Details4.5.19 Berm Detail for Cuts or Fills over 35 feet4.5.20 Slope Underdrain Detail4.5.21 Sample Underdrain Placement Detail for High Groundwater Table Areas4.5.22 Sample Fabric and Surcharge Detail4.5.23 Sample Drainage Detail for Reconstructed Cut Section4.5.24 Shrinkage Factor4.5.25 Recommended Shrinkage Factor by Counties4.5.26 Pipe Culvert Material Alternates - Piedmont/Blue Ridge Region Revised 3-22-104.5.27 Pipe Culvert Material Alternates - Coastal Plain Region Revised 3-22-104.5.28 Benching Detail Revised 9/29/084.5.29 Guidelines for Base Thickness Recommendations4.5.30 Serrated Slope Detail4.5.31 Sample Wick Drain Detail4.5.32 Sample Soil Survey Location Map4.5.33 Guidelines for Lime Stabilization Revised 3/7/114.6 Soil Survey Report Checklist Revised 3/2/064.7 Typical Software for Soil Surveys Revised 11/16/014.8 Guidelines for Scope & Cost Estimate Workbooks 4.8.1 Personnel Job Descriptions Revised 11/15/014.8.2 Soil Survey Cost Proposal Worksheets
4.4.1 Blank Soil Survey Report Template Revised 12/18/094.4.2 Sample Soil Survey Report - Coastal Plain Region4.4.3 Sample Soil Survey Report - Piedmont Valley or Valley and Ridge Region4.4.4 County map-soils memo4.4.5 County Map4.4.6 Guidelines for Subgrade Treatment Revised 2/28/06
4.5.1 Physiographic Regions in Georgia4.5.2 Erosion Index Revised 4/11/974.5.3 Historical pH and Resistivity Values4.5.4 Sample Roadway Profile4.5.5 Soil Classifications4.5.6 Soil Classes4.5.7 Counties with Acid-Producing Rock4.5.8 Sample Field Book Entries4.5.9 Erosion Index Chart4.5.10 Sample Laboratory Testing Report4.5.11 Sample Detail for Rock Cut4.5.12 Sample Removal Detail4.5.13 Correlation Chart for Estimating Soil Support Value(s)4.5.14 Regional Factors for Use in Flexible Pavement Design4.5.15 K Values4.5.16 Map of Acceptable Soil Cement Use Revised 2/12/044.5.17 Sample Rock Embankment Slope Detail4.5.18 Sample Soil Reinforcement Details4.5.19 Berm Detail for Cuts or Fills over 35 feet4.5.20 Slope Underdrain Detail4.5.21 Sample Underdrain Placement Detail for High Groundwater Table Areas4.5.22 Sample Fabric and Surcharge Detail4.5.23 Sample Drainage Detail for Reconstructed Cut Section4.5.24 Shrinkage Factor4.5.25 Recommended Shrinkage Factor by Counties4.5.26 Pipe Culvert Material Alternates - Piedmont/Blue Ridge Region Revised 3-22-104.5.27 Pipe Culvert Material Alternates - Coastal Plain Region Revised 3-22-104.5.28 Benching Detail Revised 9/29/084.5.29 Guidelines for Base Thickness Recommendations4.5.30 Serrated Slope Detail4.5.31 Sample Wick Drain Detail4.5.32 Sample Soil Survey Location Map4.5.33 Guidelines for Lime Stabilization Revised 3/7/11
4.8.1 Personnel Job Descriptions Revised 11/15/014.8.2 Soil Survey Cost Proposal Worksheets
5.1 Introduction Revised 11/15/015.2 Retaining Wall Foundation Investigations Revised 3/2/065.3 Supplemental Retaining Wall Information 5.3.1 Wall Types Used by Georgia DOT5.3.2 Typical Section for Retaining Walls < 18' High5.3.3 Typical Section for Retaining walls > 18' High5.3.4 MSE Wall Locations in Georgia5.3.5 Retaining Wall Panel Shapes5.3.6 Proposed MSE Wall Panel Shapes5.3.7 Soil Nailing Description5.3.8 Double Wall Description5.3.9 Insert Wall Description5.3.10 Details of Retaining Walls Typical Sections5.3.11 Typical Section of a Permanently Anchored Retaining Wall5.3.12 Wall boring layouts 5.4 Blank Retaining Wall Report Template 5.4.1 Sample Stand-alone Retaining Wall Report 5.4.2 Sample Retaining Wall Report Included with BFI Report5.5 Retaining Walls and Other Structures Checklist Revised 11/2/015.6 Retaining Wall Cost Estimate - Refer to BFI/Other Structures Worksheets
5.3.1 Wall Types Used by Georgia DOT5.3.2 Typical Section for Retaining Walls < 18' High5.3.3 Typical Section for Retaining walls > 18' High5.3.4 MSE Wall Locations in Georgia5.3.5 Retaining Wall Panel Shapes5.3.6 Proposed MSE Wall Panel Shapes5.3.7 Soil Nailing Description5.3.8 Double Wall Description5.3.9 Insert Wall Description5.3.10 Details of Retaining Walls Typical Sections5.3.11 Typical Section of a Permanently Anchored Retaining Wall5.3.12 Wall boring layouts
5.4.1 Sample Stand-alone Retaining Wall Report 5.4.2 Sample Retaining Wall Report Included with BFI Report
6.1 Introduction6.2 Sample Other Structure Reports 6.2.1 Sample Light Tower Foundation Report6.2.2 Sample Rest Area Foundation Report6.2.3 Sample Culvert Foundation Report as Part of Soil Survey Report6.3 Other Structures Cost Estimate - Refer to BFI/Other Structures Worksheets
6.2.1 Sample Light Tower Foundation Report6.2.2 Sample Rest Area Foundation Report6.2.3 Sample Culvert Foundation Report as Part of Soil Survey Report
7.1 Introduction7.2 Pavement Supplemental Information 7.2.1 Road Surface Management: Pavement Condition Evaluation System
7.2.1 Road Surface Management: Pavement Condition Evaluation System
8.1 Introduction Revised 11/15/038.2 Sample Special Provisions 8.2.1 SP205 Roadway Excavation Revised 09-24-098.2.2 SP 208 Embankments Revised 1/15/038.2.3 SP209 Subgrade Construction Revised 1/15/038.2.4 SP 209 Subgrade Construction Revised 11/15/038.2.5 SP 457 Geogrid Reinforced Slopes (Contractor Design) Revised 3/13/068.2.6 SP 457 Geogrid Reinforced Slopes (Dept or Consultant Design) Revised 3/13/068.2.7 SP 457 Geogrid Reinforcement Embankment Stalization Only Revised 7/13/058.2.8 SP 520 Piling (Option to Predrill) Revised 11/15/038.2.9 Piling - Pilot Holes Revised 1/24/088.2.10 SP 524 Drilled Caisson Foundations (Wet)Revised 11/9/068.2.11 SP 524 Drilled Caisson Foundations (Dry) Revised 11/9/068.2.12 SP 572 Slope Underdrains Revised 1/4/068.2.13 SP809 Geogrid Materials Revised 11/15/038.2.14 SP881 Fabrics (Multiple fabric layers) Revised 6/16/068.2.15 SP881 Fabrics Revised 6/16/068.2.16 Geogrid Reinforced Slope Embankment Internal Drainage Details Moved to section 8.2.5 (6/24/09)8.2.17 Slope Reinforcement Details Deleted 6/24/09
8.2.1 SP205 Roadway Excavation Revised 09-24-098.2.2 SP 208 Embankments Revised 1/15/038.2.3 SP209 Subgrade Construction Revised 1/15/038.2.4 SP 209 Subgrade Construction Revised 11/15/038.2.5 SP 457 Geogrid Reinforced Slopes (Contractor Design) Revised 3/13/068.2.6 SP 457 Geogrid Reinforced Slopes (Dept or Consultant Design) Revised 3/13/068.2.7 SP 457 Geogrid Reinforcement Embankment Stalization Only Revised 7/13/058.2.8 SP 520 Piling (Option to Predrill) Revised 11/15/038.2.9 Piling - Pilot Holes Revised 1/24/088.2.10 SP 524 Drilled Caisson Foundations (Wet)Revised 11/9/068.2.11 SP 524 Drilled Caisson Foundations (Dry) Revised 11/9/068.2.12 SP 572 Slope Underdrains Revised 1/4/068.2.13 SP809 Geogrid Materials Revised 11/15/038.2.14 SP881 Fabrics (Multiple fabric layers) Revised 6/16/068.2.15 SP881 Fabrics Revised 6/16/068.2.16 Geogrid Reinforced Slope Embankment Internal Drainage Details Moved to section 8.2.5 (6/24/09)8.2.17 Slope Reinforcement Details Deleted 6/24/09
9.1 Reference Documents Revised 2/27/06
ForewordPreface
1. Introduction2. Geotechnical Practices - General3. Bridge Foundation Investigation (BFI) Guidelines4. Soil Survey Guidelines5. Retaining Wall Guidelines6. Other Structures Guidelines7. Pavement Condition & Thickness Design Guidelines8. Special Provisions9. References
1. Introduction
1.1 Foreword1.2 Preface 1.3 The Consultant as an Extension of GDOT Staff1.4 Responsibility Chart Revised 12/1/011.5 Draft Consultant Performance Evaluation Form
2.1 Introduction Revised 11/19/012.2 Guidelines for Project Notifications within DOT Revised 11/19/012.3 Guidelines for Work on Private Property Revised 11/2/01 2.3.1 Sample Right-of-Entry Letter 2.3.2 Sample Project Access Letter - Consultant 2.4 Erosion Control and Site Restoration Revised 11/19/012.5 Limitations of Liability - GDOT Consultants Revised 11/15/012.6 Unsuitable Materials - Investigations Revised 11/15/012.7 Sample Retention, Storage, and Handling Revised 11/12/04
Home | Privacy Notice | Employment | Contact Us ©2010 Georgia Department of Transportation. All Rights Reserved Best Viewed with Internet Explorer 7